Back to our work

Interior demolition

Room interior demolition before renovation

We prepared a room for the next stage of renovation.

Service
Interior demolition
Empty room after interior demolition: furniture and floor covering removed, timber cladding and radiator kept
Room before interior demolition: bed, furniture, patterned floor covering and timber-clad ceiling and walls
BEFOREAFTER
Empty room after interior demolition: furniture and floor covering removed, timber cladding and radiator kept

Empty room after interior demolition: furniture and floor covering removed, timber cladding and radiator kept

1 / 2

About the job

What was done?

We cleared the room of furniture and removed the agreed floor coverings and finish layers. The structures to be kept, the window and the radiator stayed in place.

Work stages

How did it go?

  1. 01

    Site preparation

    We went over the room, the parts to be removed and the surfaces that had to stay.

  2. 02

    Clearing the room

    We removed the furniture, loose furnishings and other items in the way of the renovation.

  3. 03

    Removing finish layers

    We removed the agreed floor and wall finishes and other layers in the way of the next stage.

  4. 04

    Cleaning the surfaces

    After the removal work, we cleared loose material from the surfaces and tidied the work area.

  5. 05

    Ready for the next stage

    The room was left clear, tidy and ready for the renovation to begin.

You have a plan.
We start
with demolition.

Briefly describe what needs to be demolished.
We’ll confirm the scope together.

+372 5663 5298
Call

GET A QUOTE

Let’s talk about your project.

Briefly describe the work you need – the more we know, the more precisely we can reply.