Interior demolition
Room interior demolition before renovation
We prepared a room for the next stage of renovation.
About the job
What was done?
We cleared the room of furniture and removed the agreed floor coverings and finish layers. The structures to be kept, the window and the radiator stayed in place.
Work stages
How did it go?
- 01
Site preparation
We went over the room, the parts to be removed and the surfaces that had to stay.
- 02
Clearing the room
We removed the furniture, loose furnishings and other items in the way of the renovation.
- 03
Removing finish layers
We removed the agreed floor and wall finishes and other layers in the way of the next stage.
- 04
Cleaning the surfaces
After the removal work, we cleared loose material from the surfaces and tidied the work area.
- 05
Ready for the next stage
The room was left clear, tidy and ready for the renovation to begin.