Building demolition

Old outbuilding demolition

We demolished a dilapidated outbuilding and prepared the site for the next stage.

Cleared ground where the outbuilding stood, with concrete posts and stacked bricks left
Dilapidated brick and timber outbuilding with a collapsing roof before demolition
BEFOREAFTER
Cleared ground where the outbuilding stood, with concrete posts and stacked bricks left

Cleared ground where the outbuilding stood, with concrete posts and stacked bricks left

1 / 2

About the job

What was done?

The site had an old timber and brick outbuilding whose structure had badly deteriorated. We removed the roof and wall structures and demolished the main part of the building. As we worked, we gathered the demolition material and tidied the work area to the agreed extent. What remains is a clear site, ready for the next works.

Work stages

How did it go?

  1. 01

    Site preparation

    We assessed the building’s condition, access and the agreed scope of demolition.

  2. 02

    Removing the structures

    We gradually removed the roof and timber structures and other parts to be demolished.

  3. 03

    Demolishing the main building

    We demolished the remaining parts of the building to the agreed extent.

  4. 04

    Gathering the demolition material

    We gathered the material removed during the work to clear the building’s footprint.

  5. 05

    Tidying the site

    We tidied the work area and left it ready for the next works.

Get in touch

Let’s talk about your project.

Describe the job and where the site is. Add photos if you can.

+372 5663 5298
  • Clear quote
  • Agreed schedule
  • Removal and clean-up as needed
Call