Interior demolition
Kitchen interior demolition
We prepared an old kitchen for the next stage of renovation.
About the job
What was done?
We removed the kitchen fittings, the sink and the old cooker, as well as the agreed structures and finish layers. The main structures and the window area needed for the next works were kept.
Work stages
How did it go?
- 01
Site preparation
We went over the kitchen units to be removed, the existing connections and the parts that had to stay.
- 02
Removing the kitchen fittings
We removed the old kitchen fittings and other items in the way of the renovation.
- 03
Removing the cooker and kitchen area
We removed the old cooker and the agreed structures and finishes of the kitchen area.
- 04
Clearing the surfaces
We removed the remaining loose layers not needed for the renovation, leaving the work area clear for the next stage.
- 05
Tidying the room
After the removal work, we tidied the room and left it ready for the next renovation works.