Back to our work

Interior demolition

Kitchen interior demolition

We prepared an old kitchen for the next stage of renovation.

Service
Interior demolition
Empty kitchen after interior demolition, with the cooker, sink and kitchen units removed
Old kitchen with a cooker, a sink unit and a tiled wall before interior demolition
BEFOREAFTER
Empty kitchen after interior demolition, with the cooker, sink and kitchen units removed

Empty kitchen after interior demolition, with the cooker, sink and kitchen units removed

1 / 2

About the job

What was done?

We removed the kitchen fittings, the sink and the old cooker, as well as the agreed structures and finish layers. The main structures and the window area needed for the next works were kept.

Work stages

How did it go?

  1. 01

    Site preparation

    We went over the kitchen units to be removed, the existing connections and the parts that had to stay.

  2. 02

    Removing the kitchen fittings

    We removed the old kitchen fittings and other items in the way of the renovation.

  3. 03

    Removing the cooker and kitchen area

    We removed the old cooker and the agreed structures and finishes of the kitchen area.

  4. 04

    Clearing the surfaces

    We removed the remaining loose layers not needed for the renovation, leaving the work area clear for the next stage.

  5. 05

    Tidying the room

    After the removal work, we tidied the room and left it ready for the next renovation works.

You have a plan.
We start
with demolition.

Briefly describe what needs to be demolished.
We’ll confirm the scope together.

+372 5663 5298
Call

GET A QUOTE

Let’s talk about your project.

Briefly describe the work you need – the more we know, the more precisely we can reply.