Interior demolition
Demolition of partition walls in an apartment
In one day, we demolished the partition walls in an apartment and took the demolition debris from the fifth floor to a waste station.
About the job
What was done?
In the apartment, partition walls with door openings separated the corridor and two rooms. We demolished the partition walls and removed the reinforcing bars that had been inside them. This turned the corridor and the rooms into one open space. We put the demolition debris into bags, brought it down from the fifth floor and took it to a waste station. We did the whole job in one day. The external walls with the windows and radiators and the bathroom and WC walls were left in place. Marks on the floor and ceiling show where the former partition walls stood.
Work stages
How did it go?
- 01
Partition wall demolition
We demolished the partition walls between the corridor and the rooms, together with their door openings.
- 02
Removing the reinforcing bars
We removed the reinforcing bars that were left between the ceiling and the floor after the demolition.
- 03
Bagging the debris
We put the pieces of concrete and other demolition debris into bags.
- 04
Taking it to the waste station
We brought the bags down from the fifth floor and took them to a waste station.